A guide to commissioning an air source heat pump: suitability checks, permissions, hiring order, realistic costs and avoiding bad installers.
Planning permission may be required depending on property type, location and the unit's position — check with your local planning authority before installation.
Heat pump and associated electrical work fall under Building Regulations and Part P. MCS-certified installers notify Building Control automatically via their Competent Person Scheme.
Scotland's building standards and grants differ from England's, so check locally. Northern Ireland has its own building control and grant system.
You should receive an MCS certificate and Building Control compliance confirmation before the job is considered legally complete.
Before you start: Which electrical jobs can I do myself? Part P explained