Listed building consent is needed for most changes, inside or out, to a listed building — always check with the council first.
It is a criminal offence to carry out work that affects a listed building's character without listed building consent.
Curtilage structures fixed before 1 July 1948 are treated as part of the listing by law, even if not separately described.
Listed building consent, planning permission and Building Regulations are separate legal processes, each enforced independently.
Unauthorised works to a listed building are a criminal offence with no time limit on enforcement action.