A multi-phase draughtproofing project that works room by room, from vents to chimney, over several weekends.
Don't block airbricks or trickle vents that provide required background ventilation under Building Regulations Part F.
Check for cables and pipes before drilling into a masonry door frame or reveal.
Check for hidden doorbell or alarm wiring behind the letterbox plate before drilling.
Check for cables and pipes before drilling near skirting, as cables often run at this height.
Check for cables and pipes before lifting floorboards.
Check for cables and pipes before screwing a batten into a window reveal.
Check for cables before drilling into the loft hatch frame or surrounding ceiling.
Never block a flue that serves a working open fire, woodburner or gas appliance; get it checked by a chimney sweep or Gas Safe engineer first.
Travis Perkins and Tooled Up links are affiliate links: if you buy after clicking, we may earn a small commission at no extra cost to you. B&Q and Amazon links are plain searches and earn us nothing.
Save this as a project