AB-05Fit the new box to match your wallOn plasterboard over timber or metal studs, push the dry-lining box into the hole and tighten its two screws until the plastic wings flip out and clamp the board - the wings grip the board itself, not the stud, so the fixing works the same either way. If trimming overlaps a metal stud track, cut it with tin snips rather than a padsaw, and tape over any sharp edges. On dot-and-dab, check the void for an adhesive dab blocking the box; chip a small amount away with a bolster so the box sits flush, without disturbing dabs further away. On lath and plaster, the wings often can't grip the uneven laths, so slip a small timber offcut behind them as a backing pad and screw the box to that instead. If a pilot hole ever shows solid brick or block with no give at all, stop - that's solid masonry, and you need a masonry back box screwed into wall plugs, not a dry-lining box.