Replacing an external door needs Building Regulations sign-off and the right registered installer; here's how to commission it properly.
Door replacement falls under Building Regulations (Part L for insulation, and safety glazing where there's glass). This must be certified either by a FENSA/CERTASS-registered installer or signed off by local authority Building Control. On a listed building you also need listed building consent; in a conservation area, check whether an Article 4 direction applies.
Replacement external doors must meet Building Regulations. The certificate from FENSA, CERTASS, or Building Control is the proof. Missing certificates commonly cause problems at the point of selling a house.
In Scotland, new or widened openings need a building warrant before work starts. Northern Ireland has its own separate Building Regulations framework. Always confirm the correct route with the relevant local authority before work begins.
Before you start: Do I need Building Regulations approval to replace windows or doors? · What needs listed building consent?