PR-04Locate the joists above the ceilingLath and plaster ceilings are always nailed to timber joists - this construction predates metal stud and ceiling systems, so you won't find steel behind it here. Joists usually run at 400-600mm centres; tap along the ceiling and listen for the dull, solid sound of a joist against the hollow sound of the gap between them, then confirm with your detector. Drill a 2-3mm pilot hole at your best guess - timber dust means you've found the joist; if the bit drops through with no resistance, move 20mm along and try again. If your ceiling turns out to be plasterboard on a metal frame rather than lath and plaster, stop - that needs different, metal-rated fixings, not the coach screws in this guide.