KITCHENS

Fit a hanging pot rack to a lath and plaster ceiling

Fix a heavy-duty pot rack to a lath and plaster ceiling by anchoring it into at least two joists with a timber batten.

PR-01Clear and protect the roomClear worktops, the hob and anything below where the rack will hang. Lay dust sheets over units and the floor - lath and plaster sheds a surprising amount of dust and debris once you start drilling. Move breakables well clear of the ladder's footprint.
2 each · Dust sheet
1 roll · Masking tape
PR-02Gather your tools and fixingsYou'll need a cable and pipe detector, a stable stepladder, a drill with wood bits, a spirit level, a tape measure and a pencil, plus the timber batten and fixings below. Check your stepladder is stable and rated for the job before you start.
1 each · Cable/pipe detector
1 each · Spirit level
1 each · Tape measure
PR-03Find your stopcock and think about the electricsBefore you drill anything, find your stopcock - usually under the kitchen sink - and check it turns freely, so you can shut the water off fast if you hit a pipe. A detector won't find every cable: some run deeper than expected, sit in metal conduit, or were added in a past rewire with no obvious pattern. If you have any doubt at all about what's behind the ceiling, isolate the relevant circuit at the consumer unit before you drill.
PR-04Locate the joists above the ceilingLath and plaster ceilings are always nailed to timber joists - this construction predates metal stud and ceiling systems, so you won't find steel behind it here. Joists usually run at 400-600mm centres; tap along the ceiling and listen for the dull, solid sound of a joist against the hollow sound of the gap between them, then confirm with your detector. Drill a 2-3mm pilot hole at your best guess - timber dust means you've found the joist; if the bit drops through with no resistance, move 20mm along and try again. If your ceiling turns out to be plasterboard on a metal frame rather than lath and plaster, stop - that needs different, metal-rated fixings, not the coach screws in this guide.
1 each · 2.5mm pilot drill bit
PR-05Mark your fixing line across at least two joistsA loaded pot rack pulls and swings every time you lift a pan, so it can never rely on lath and plaster alone. A spring toggle or plasterboard-style fixing will pull straight through old, brittle plaster under that kind of movement. Mark a level line across at least two joists, ideally three, centred where you want the rack to hang, using your spirit level.
PR-06Cut a timber batten to bridge the joistsCut a length of 44 x 22mm PSE timber to span your marked joists, with around 50mm spare at each end. This batten spreads the rack's weight across several joists instead of one point, and gives you a solid, wide fixing surface instead of trying to hit narrow joist edges exactly.
1 each · Timber batten, 44 x 22mm PSE, 1.2m
PR-07Drill and fix the batten to the joistsCheck your detector reading one more time along the line, then drill a pilot hole at each fixing point before committing to full-size holes - if anything other than timber dust comes out, stop immediately. Hold the batten against your marked line and drive coach screws through the batten, through the plaster and lath, and at least 40mm into solid joist timber, with one screw at every joist crossing as a minimum. Fit a washer under each screw head so it can't pull through the wood over time.
6 each · Coach screws, M8 x 100mm
6 each · Washers, M8
PR-08Fit rated hooks or eye boltsScrew heavy-duty eye bolts or ceiling hooks - rated for the loaded weight of the rack plus pots, usually 15-20kg - directly into the timber batten, never into the surrounding plaster. Space them to line up with your pot rack's own fixing points.
4 each · Heavy-duty rated eye hooks
PR-09Test the fixing before you load itHang the rack from the hooks and pull down hard on each fixing point by hand, checking the ceiling around the batten for movement, cracking or falling dust. If you see or hear anything moving, stop and go back to check your coach screws are biting into solid joist timber.
PR-10Load the rack graduallyAdd pots and pans a few at a time rather than all at once, checking the ceiling after each addition. Keep your heaviest items near the centre, over your strongest fixing points, rather than loading one end.
PR-11Patch up and tidy awayFill any small gaps or hairline cracks around the batten edges with flexible multi-purpose filler, feathering it into the surrounding plaster once dry. Sand lightly, then vacuum up plaster and wood dust from the floor and units before putting your kitchen back together.
1 tub · Multi-purpose filler
1 each · Fine sandpaper sheet

Some links may earn us a small commission at no extra cost to you.

Save this as a project

Back to all guides