CK-05Re-fix a loose board before you fill the crackInto a timber joist, drive a 3.5 x 40mm drywall screw through the board into the centre of the joist, either side of the crack. Into a light steel joist, use a self-drilling wafer-head screw made for metal stud track - never a wood screw, which strips straight through 0.5mm steel, and never a plain plastic wall plug. If the ceiling is plasterboard fixed with adhesive dabs to a solid concrete soffit, a fixing needs to pass through the board and the dab void, so use one at least 60-75mm long into the concrete. On a lath and plaster ceiling, don't screw into a lath - find the joist behind it with your detector and fix into that instead; if a large area has dropped away from the laths, that's a re-boarding job, not a filling job. A metal joist or an adhesive dab alone will not hold a sagging board up on its own - if it keeps drooping after fixing, it needs a proper timber noggin or extra screws into the joists either side.