A multi-phase loft boarding project: insulate, wire for a light, board, fit a ladder and draughtproof the hatch over several weekends.
Building Regulations can apply to loft work, particularly around structural loading and the fire safety of the hatch and ladder opening. Check the linked guide before starting, and contact your local council building control if you're unsure.
A new lighting point is a job for a registered electrician, who will certify the work; if it needs a new circuit, that is notifiable under Building Regulations. Don't attempt it yourself.
Travis Perkins and Tooled Up links are affiliate links: if you buy after clicking, we may earn a small commission at no extra cost to you. B&Q and Amazon links are plain searches and earn us nothing.
Save this as a project