SHELVING & STORAGE

Fit wall storage for a vacuum and mop to a timber stud wall

Fit a wall-mounted rack to hold your vacuum and mop off the floor, from marking positions to final load test.

WS-01Plan where the rack will goPick a spot where the vacuum and mop hang clear of the floor, doors and any radiator. Hold the rack in place and mark the top edge with a pencil, checking it's level with a spirit level. Measure the fixing holes on the rack itself so you know exactly where you'll need to drill.
1 each · Wall storage rack for vacuum and mop
1 each · Tape measure
1 each · Spirit level
1 each · Pencil
WS-02Confirm what's behind the wallRun a stud detector or magnet across the marked area to find the studs, and note the spacing of the screw heads holding the plasterboard on — this tells you where each stud centre is. Tap between the marks: a hollow sound means you're between studs, a duller thud means you've hit one. If you're not sure whether a stud is timber or metal, drill a small 3mm pilot hole — fine wood dust means timber, bright metal swarf means a metal stud. Metal studs are common in flats, new builds, and any wall refitted since the 1990s, so don't assume timber just because the wall feels solid.
1 each · Stud detector or magnet stud finder
WS-03Drill the fixing holes safelyCables and pipes can run almost anywhere in a wall, not just in the usual safe zones, and a detector can miss ones that are deep, in metal conduit, or behind metal-backed board — so treat every hole as if something might be there until you've drilled a little way and proved it isn't. Before you drill, find your stopcock (usually under the kitchen sink) and check it turns, so you can shut off the water fast if you hit a pipe. If you have any doubt, isolate the circuit at the consumer unit first. Drill straight and steady, stopping if you feel any resistance change or smell burning.
1 each · Drill
1 each · Drill bit set (wood and masonry)
WS-04Choose the right fixing for your wallTimber stud (plasterboard on timber): drill a 3mm pilot hole into the centre of the stud and use a wood screw at least 50mm long — never rely on the plasterboard alone. Metal stud: never use a wood screw or plastic plug, as they strip straight through 0.5mm steel — use a self-drilling metal-stud screw or a toggle-type hollow-wall fixing rated for the weight. Fixing between studs into plasterboard only: use a proper toggle or hollow-wall anchor sized for the rack's loaded weight, not a basic plug. Solid brick or block: drill 6mm, insert a wall plug, then a 50mm screw. Dot-and-dab plasterboard over masonry: use a fixing long enough to pass through the dab (often 40-50mm) and bite into the masonry behind, not just the plasterboard skin. Lath and plaster: locate the timber laths first, as plasterboard-style fixings can crack the old plaster — screw into the lath or, better, into the stud behind it.
4 each · Wood screws 50mm
4 each · Self-drilling metal-stud screws
4 each · Toggle-type hollow-wall anchors
4 each · Wall plugs (masonry)
WS-05Fix the rack to the wallHold the rack against your marks and drive the chosen fixings through its mounting holes into the studs or anchors. Check it's level again once the first two screws are in, before fully tightening the rest. Don't overtighten — stop once the rack sits flush and doesn't rock.
1 each · Screwdriver bit for drill
WS-06Fit the hooks and clipsClip or screw the mop and vacuum holders onto the rack at heights that suit the handles you own. Space them so items don't bump into each other when hung side by side.
2 each · Mop and broom clips (if not integral to rack)
WS-07Load test and tidy upHang the vacuum and mop and give the rack a firm downward and outward tug to check nothing shifts or the wall doesn't flex. Vacuum up any dust or debris from drilling and wipe down the wall and floor. Store any leftover fixings in a labelled bag in case you need to adjust the rack later.
1 each · Dust sheet

Some links may earn us a small commission at no extra cost to you.

Save this as a project

Back to all guides