Snag a house before selling: fill, paint, fix doors and taps, reseal and regrout, then check paperwork, over one or two weekends.
Always check with a cable and pipe detector before fixing or filling into a wall, floor or ceiling, and still expect something to be there.
Check for cables and pipes with a detector before drilling into a door frame or surrounding wall, even though it's less likely there.
A completion certificate or Building Control sign-off is normally needed for notifiable work like new circuits, consumer units, or structural changes. Never attempt notifiable electrical work or any gas work yourself — contact a qualified electrician or Gas Safe engineer instead.
Travis Perkins and Tooled Up links are affiliate links: if you buy after clicking, we may earn a small commission at no extra cost to you. B&Q and Amazon links are plain searches and earn us nothing.
Save this as a project