FS-05Choose the right fixing for your wall typeSolid brick or block: drill a 10mm hole at least 60-70mm deep and use a heavy-duty sleeve or resin anchor rated for the shelf's load. Dot-and-dab: the rods must reach through the plasterboard and the 20-40mm dab gap into the solid masonry behind, so use a long resin or sleeve anchor, typically 150mm, and confirm the gap depth with a long thin drill bit first. Timber stud: fixings must land in the centre of a real timber stud; if none lines up, fit a timber noggin between two studs first, screwed in with 75mm screws, then fix into that. Metal stud: a metal stud alone will not carry this weight, so screw a plywood pattress to the studs with self-drilling metal-stud screws, then fix the rods into the pattress; never use a plasterboard toggle or an ordinary wood screw here. Lath and plaster: find solid timber behind the laths using the same detector method, drill a pilot hole first to stop the brittle plaster cracking, and fit a pattress across at least two studs or joists if nothing lines up directly.