Plan the layout, sort any sockets with an electrician, then fit a dado rail and panelling, caulk, and paint over two weekends.
Always check for hidden cables and pipes with a detector before drilling or fixing into any wall, and still expect something to be there even after checking.
Moving a socket or switch on an existing circuit is not notifiable in England but is still an electrician's job; in Wales it can be notifiable, so check if unsure. The circuit must always be isolated at the consumer unit and proved dead before any faceplate is removed.
Travis Perkins and Tooled Up links are affiliate links: if you buy after clicking, we may earn a small commission at no extra cost to you. B&Q and Amazon links are plain searches and earn us nothing.
Save this as a project