KITCHENS

Hang kitchen wall cupboards on a metal stud wall

Plan cupboard positions, check your wall structure, then drill, fix and hang units level and secure in one session.

KC-01Clear the wall and set upEmpty and remove anything below the work area, and take down old cupboards if you're replacing them. Lay a dust sheet along the worktop and floor. Check your worktop is protected before you start drilling above it, since dust and screws will fall.
1 each · Dust sheet
1 each · Tape measure
1 each · Pencil
KC-02Work out what your wall is made ofRun a stud detector or magnet across the wall at cupboard height in a grid pattern. A magnet that sticks weakly to the surface on regular vertical lines about 400-600mm apart means metal studs; if the magnet only sticks to screw heads but the frame itself isn't magnetic, it's timber studs. Tapping a solid brick or block wall sounds dull throughout, dot-and-dab sounds hollow with occasional solid patches, and lath and plaster sounds hollow and slightly springy. If still unsure, drill a small 3mm test hole at a spot that will be hidden: pale wood dust means timber, fine grey swarf means metal stud, and red or grey grit means brick or block.
1 each · Stud detector
1 each · Small magnet
1 each · 3mm drill bit
KC-03Mark the cupboard heights and positionsStandard practice is to leave 450-600mm between the worktop and the bottom of wall cupboards, but check your kitchen design first. Draw a level line for the top of the cupboards using a spirit level, then mark each cupboard's width and the position of its hanging points. Double-check corners and any gaps for appliances before you drill anything.
1 each · Spirit level (600mm)
KC-04Choose the right fixing for your wall typeInto a timber stud, use a wood screw at least 40mm long driven into the centre of the stud. Into a metal stud, use a self-drilling metal-stud screw or a toggle-type hollow-wall anchor rated for the load - never a plain plastic plug or an ordinary wood screw, both strip straight through 0.5mm steel. Into solid brick or block, use a matching wall plug and screw drilled to the correct depth. Through dot-and-dab plasterboard, use a fixing long enough (usually 75-90mm) to pass through the board and adhesive gap and grip the masonry behind, and on lath and plaster, always fix into the timber studs behind the laths, never the laths themselves.
8 each · Wood screws (40mm)
8 each · Metal-stud self-drilling screws
4 each · Heavy-duty toggle anchors
8 each · Masonry wall plugs and screws
KC-05Fit a timber noggin or pattress if you have metal studsA metal stud toggle alone will not hold a loaded kitchen cupboard - the weight of crockery and the tug of opening doors will pull it out over time. Cut a length of 45x45mm timber to span at least two studs and screw it between them using self-drilling metal-stud screws, or fit a plywood pattress across the studs instead. Before drilling into any wall, remember cables and pipes can run almost anywhere - a detector helps but can miss cables in metal conduit or behind metal-backed plasterboard, so still drill cautiously and stop if you feel resistance or see anything unexpected. Find your stopcock (usually under the kitchen sink) and check it turns before you start, and if you have any doubt, isolate the circuit at the consumer unit first.
1 metre · Timber noggin (45x45mm, per metre)
1 each · Plywood pattress (18mm)
6 each · Self-drilling metal-stud screws
KC-06Fix the hanging rail or brackets to the wallHold the rail or bracket level against your marked line and mark the fixing holes. Drill pilot holes using the right size for your wall and fixing type, checking again for cables or pipes as you go - stop immediately and check your stopcock or consumer unit if you hit anything unexpected. Fit the rail or brackets using the fixings chosen for your wall type, tightening firmly but not overtightening into plasterboard.
1 each · Cupboard hanging rail
4 each · Corner cupboard brackets
KC-07Lift and hang the first cupboardWith help if the cupboard is heavy, lift it onto the rail or brackets and check it hangs level. Adjust the hanging bolts on the back of the cupboard if it has them, rather than re-drilling the wall. Check the front edge is plumb using your spirit level before moving on.
KC-08Level, join and secure adjacent cupboardsHang the next cupboard the same way, then clamp the two cabinet sides together and check both fronts line up flush. Drill small pilot holes through the internal sides and join them with cupboard joining screws or bolts. Repeat along the run, checking level after each addition.
6 each · Cupboard joining bolts
1 each · Sash clamp (hire or borrow)
KC-09Fit doors, shelves and handlesFit shelves inside each cupboard first, then attach doors using the hinges provided, adjusting them so gaps are even. Mark and drill handle positions carefully, checking twice before drilling since holes can't be hidden once made. Fit handles with the screws supplied.
6 each · Cupboard handles
KC-10Tidy up and final checksVacuum up dust and swarf from drilling, especially any metal filings if you worked on metal studs. Wipe down worktops and check all cupboards are level, secure and close smoothly. Give each cupboard a firm push test before loading it with anything heavy.
1 each · Vacuum cleaner (own)

Some links may earn us a small commission at no extra cost to you.

Save this as a project

Back to all guides