Drain, remove and refit a heated towel rail safely, checking pipework and electrics before you drill.
If your towel rail is dual fuel with a wired electrical connection (not just a plug), any new wiring work in a bathroom must meet Part P and the bathroom zone rules in BS 7671. If in doubt, get a qualified electrician to handle that part.
Some links may earn us a small commission at no extra cost to you.
Save this as a project