WP-01Clear the room and strip the wall backMove furniture clear and lay dust sheets along the skirting run. Take down pictures, remove socket and switch faceplate covers if panelling will run behind them, and prise off the existing skirting board with a bolster and pry bar, working gently so you can reuse or match it later. Check the wall with a spirit level for any major bow or lean before you plan your layout.
2 each · Dust sheet
1 each · Flat pry bar
1 each · Bolster chisel
WP-02Confirm what's actually behind the plasterboardEven on a job billed as a metal stud wall, check before you fix anything. Run a stud detector or a strong magnet across the wall — a line of screw heads roughly 400mm or 600mm apart marks the studs. Metal studs are usual in flats, new builds and anything refitted since the 1990s; a hollow, slightly ringing sound between marks and a fine steel swarf from a small pilot hole confirm metal, while soft timber dust means you actually have timber studs. Older houses sometimes have lath and plaster behind a stud line instead of plasterboard — if your pilot hole brings out thin wood strips and crumbly lime plaster, treat it as lath and plaster, not board, and fix into the timber studs behind it rather than the laths.
1 each · Stud detector
WP-03Check for pipes and cables before you drill anythingCables and pipes can run almost anywhere in a wall, not just in the 'safe zones'. Sweep the whole area you plan to drill with a cable and pipe detector, then still treat the wall as if something is there — detectors miss deep cables, anything in metal conduit, cables behind metal-backed board, and they get confused near a metal stud frame itself. Find your stopcock now, usually under the kitchen sink, and check it turns freely so you can shut the water off fast if you hit a pipe. If you have any doubt, isolate the relevant circuit at the consumer unit before drilling near a socket or switch, and turn the water off at the stopcock before drilling anywhere close to a pipe run.
1 each · Cable and pipe detector
WP-04Mark out your panel layoutMeasure the wall's length and height and decide your rail heights — a dado rail typically sits 750-900mm up, with a lower skirting-height rail if you're doing a full shaker grid. Draw level guide lines right around the room using a spirit level, not by eye, since even a few mm out is obvious once panels go up. Mark every stud centre you found in WP-02 onto the wall in pencil so you can find them again once panels cover the marks.
1 each · Spirit level 1200mm
1 set · Pencil and chalk line
WP-05Cut the rails and stiles to lengthCut your MDF shaker rails and vertical stiles to length with a mitre saw, checking each measurement against the wall before cutting rather than trusting the first number. Sand cut ends lightly to remove any rough edges. Dry-fit a section on the floor first to check your spacing looks even before anything goes on the wall.
1 room pack · MDF shaker panelling kit
1 day · Mitre saw hire or use
1 each · Sanding block 120 grit
WP-06Fix the horizontal rails to the wallRun a bead of grab adhesive along the back of each rail and press it onto your level line, then fix mechanically at every stud centre while the adhesive sets. Into metal studs, use self-drilling metal-stud screws or a hollow-wall toggle fixing rated for the panel weight — never a plain plastic wall plug or an ordinary wood screw, both strip straight through 0.5mm steel. Into timber studs, use a 40mm wood screw driven into the centre of the stud. Where a fixing point falls on board only, between studs, use a toggle fixing rated for the panel weight rather than relying on adhesive alone. Metal studs will not hold real load on their own — this panelling is light and fine, but if you later hang anything heavy or anything that pulls away from the wall in use, you need a noggin or pattress fitted between the studs, or a fixing through to solid masonry behind.
4 each · Grab adhesive tube
40 each · Self-drilling metal stud screws 25mm
10 each · Hollow-wall toggle fixings
30 each · Wood screws 40mm
WP-07Fix the vertical stilesFit the vertical stiles between the rails the same way — grab adhesive along the back plus a mechanical fixing wherever a stile crosses a stud. If a stud wall turns out to sit on solid masonry at the base or reveals a section of solid brick or block instead of a stud (common around window reveals), drill a 6mm hole to 40mm depth, insert a wall plug, and fix directly with a screw rather than hunting for a stud that isn't there. Support each stile with masking tape or temporary battens while the adhesive cures, usually 24 hours.
10 each · Wall plugs 6mm
10 each · Screws 50mm
1 roll · Masking tape
WP-08Fill, caulk and sandFill every screw hole and any small gaps at joints with flexible decorator's filler, then run a bead of caulk along the top edge of each rail and where panelling meets the wall or skirting. Leave to dry fully, then sand lightly with fine paper so joints disappear once painted. Wipe down with a damp cloth to clear dust before painting.
2 tube · Decorator's caulk
1 tub · Flexible filler
1 pack · Fine sanding paper 180 grit
WP-09Prime and paint the panellingApply one coat of wood primer over the MDF, including all cut edges, and let it dry fully. Follow with two coats of your chosen topcoat, sanding very lightly between coats for a smooth finish. Keep the room ventilated while paint dries.
1 litre · Wood primer
1 2.5 litre tin · Satin or eggshell topcoat
1 set · Paintbrush and roller set
WP-10Refit the skirting and tidy upRefit the original skirting board, or a new length cut to fit, fixing it the same way you fixed the panelling rails for the wall type behind it. Vacuum up sawdust and offcuts, wipe down surfaces, and dispose of paint tins and adhesive cartridges according to your council's household waste rules. Give screws and toggle fixings a final check for tightness once everything has fully cured.